Approach & technology

How a Pacha project gets built.

A repeatable process, an evidence stack that feeds it, and a set of things we decline to do. Published in full, because a method you can't inspect isn't a method — it's a claim.

The lifecycle

Six stages, one continuous dataset

The same evidence base carries from feasibility through to retirement. Nothing is re-collected, re-modelled or re-argued at a handoff, because there are no handoffs.

Stage 01 — Feasibility & screening

Find out early whether this should exist.

Carbon potential modelling, eligibility check, tenure and permit review, community and political risk, and a first honest read on additionality. Ends in a go / no-go recommendation. We would rather lose a mandate here than at validation.

Stage 02 — Design & methodology

Build the project the auditor will read.

Standard and methodology selection, boundary definition, baseline setting, benefit-sharing agreements, safeguards, and the full project design document with its consultation record.

Stage 03 — Financing

Close the gap between design and first revenue.

Issuance modelling and sensitivities, investor packaging, investor outreach, and offtake or forward-sale agreements — so implementation isn't waiting on a fundraise that never lands.

Stage 04 — Implementation & MRV

Instrument the project from day one.

Baseline imagery captured before activity starts, field plots established, models trained on local data, and continuous monitoring running from the first day rather than the first verification.

Stage 05 — Validation & verification

Make the audit boring.

VVB selection and management, evidence packages assembled to the auditor's structure, corrective action requests closed quickly. A well-instrumented project has nothing to discover at audit.

Stage 06 — Issuance, tracking & sale

Follow the tonne all the way to retirement.

Registry issuance, chain-of-custody records, buyer introductions, and retirement records a corporate buyer can put in front of their assurance provider.

The evidence stack

Five layers, from orbit to the annual report

Each layer feeds the one above it. The value isn't in any single technology — it's that the chain from a satellite pixel to a disclosure line item is unbroken. We assemble this per project, to the depth the project justifies; not every project needs every layer, and we will tell you which ones yours does.

Layer 05 — Reporting

Disclosure & buyer-facing transparency

Verification packages, investor delivery reports, ESG disclosure inputs and public project pages. The layer where the evidence becomes something a third party can act on.

Layer 04 — Ledger

Chain of custody & data anchoring

Tamper-evident records of issuance, transfer and retirement, plus cryptographic anchoring of the monitoring datasets behind each issuance — so the evidence can be checked later and can't be quietly amended. Applied where a project and its buyers warrant it.

Layer 03 — Analytics

Machine-learning models & uncertainty

Models built on project-specific ground data, with uncertainty quantified and reported rather than absorbed into a conservative default. Change and leakage detection runs against the project boundary between verifications.

Layer 02 — Ground truth

Field plots, drone survey & local data

The calibration layer. Permanent sample plots, high-resolution drone capture and community-collected observations — the data that keeps the models honest and makes the satellite layer defensible.

Layer 01 — Observation

Satellite time-series

Multi-source optical and radar imagery, processed into a consistent historical baseline and an ongoing record. Covers the whole project area at every pass, including the parts a field crew never reaches.

Our integrity framework

What we check before we take a project on

Applied at feasibility, re-tested at design, and re-run annually for the life of the project. If a project fails one of these and can't be redesigned to pass, we say no.

  • Additionality — would this have happened without carbon revenue? Regulatory, financial and common-practice tests.
  • Baseline conservatism — is the counterfactual defensible, or flattering?
  • Permanence & reversal risk — fire, drought, political and tenure risk, with buffer provisioning to match.
  • Leakage — has the activity moved elsewhere? Monitored beyond the boundary, not assumed away.
  • Quantification uncertainty — stated explicitly and deducted, never hidden in a default.
  • Safeguards & consent — FPIC, tenure clarity, grievance mechanisms, documented benefit sharing.
  • Co-benefits — measured where claimed, not asserted.
  • Double counting — corresponding adjustments and registry status confirmed before sale.
Boundaries

What we don't do

A useful signal of what a consultancy actually values is what it turns down. Ours:

  • We don't take on projects whose additionality case we don't believe, however good the economics look.
  • We don't market credits we wouldn't be willing to retire against our own claims.
  • We don't write baselines to a target issuance number.
  • We don't recommend offsetting as a substitute for abatement a company could reasonably do instead.
  • We don't design projects around communities who haven't agreed to host them.

Want this applied to your project?

A scoping review runs the feasibility screen and the integrity framework against your specific situation, and ends with a written go / no-go.