Contact

Tell us about your project.

Ready to take the next step in transforming carbon markets? Describe what you're working on and we'll tell you honestly whether we can help — and if we can't, who might.

Send us a message

Please don't include confidential information. See our privacy policy.

Common questions

Working with Pacha

The things people ask before they get in touch.

How early should I contact you about a project?

As early as possible — ideally before land agreements are signed or a methodology is chosen. The most expensive mistakes in carbon project development are made in the first three months, and they're usually irreversible by validation. A feasibility screen at the idea stage costs a fraction of redesigning a project at year two.

Do you work with projects outside your usual geographies?

Yes, subject to a feasibility review. What matters more than geography is whether the activity is genuinely additional, whether tenure and consent are clear, and whether the project can be monitored to a standard buyers will accept. Tell us where you are and we'll tell you what we'd need to establish.

Can you provide the financing yourselves?

No — we are not a fund and we don't invest our own capital. What we do is make a project investable: the issuance modelling, risk analysis and technical due diligence that investors need in order to say yes, and then the introductions to impact investors, climate funds and offtakers who do provide the capital. Where a forward sale or offtake is the right structure, we help design and negotiate it.

What does an engagement typically cost?

It depends on scope, and we won't pretend otherwise. A feasibility study is a fixed-fee assignment; a full project mandate is usually a combination of retainer and success-linked components; monitoring is priced by project area and frequency. You'll get a written scope with fees before committing to anything.

We already have a project in development. Can you take it over mid-stream?

Often, yes. We start with a diagnostic review of the existing design and evidence base, tell you what we think is sound and what we'd change, and quote from there. We won't pick up a project we think is unlikely to validate without telling you first.

Carbon markets, briefly

The concepts that decide whether a project works. If you already know these, skip ahead.

What exactly is a carbon credit?

One tonne of CO2-equivalent either reduced or removed from the atmosphere — quantified against a published methodology, checked by an independent auditor, and issued as a serialised unit on a registry. The serial number is the point: it is what allows a credit to be tracked, transferred once, and retired once. A “credit” without that chain behind it is just a claim.

What does “additionality” mean, and why does everyone go on about it?

It is the test of whether the activity would have happened anyway. If a forest was never going to be felled, paying to protect it doesn't reduce emissions — it moves money. Additionality is assessed through regulatory, financial and common-practice tests, and failing it is the single most common reason a project's credits get downgraded by a ratings agency years after they were sold.

What is a baseline, and why does it matter so much?

The baseline is the counterfactual: what emissions would have been without the project. Everything a project earns is the gap between that baseline and what actually happened — which makes it the most consequential number in the entire project document, and the one most worth being conservative about. An optimistic baseline is the cheapest way to inflate a project and the fastest way to lose a buyer.

What are leakage and permanence?

Leakage is the risk that the activity simply moves: deforestation prevented inside a project boundary reappears just outside it, and the atmosphere is no better off. Permanence is the risk that stored carbon comes back — a forest burns, a landowner changes their mind, a government changes the rules. Standards manage permanence through buffer pools and long crediting commitments; leakage has to be monitored beyond the boundary rather than assumed away.

Who actually checks a project?

Three separate parties, deliberately. A standard — Verra, Gold Standard and others — publishes the methodology and the rules. An accredited, independent validation and verification body audits the project against those rules: once at design stage, then repeatedly through its life. A registry issues, tracks and retires the resulting credits. The developer is not any of these three, and that separation is what the whole system's credibility rests on.

Is the voluntary carbon market regulated?

Not by a government regulator, in the way a securities market is. It is governed by the standards themselves, by integrity initiatives such as the ICVCM and VCMI, and — increasingly — by consumer-protection and anti-greenwashing law that governs what a buyer is allowed to claim publicly. Compliance markets are a different thing: CORSIA for international aviation, and national and regional emissions trading schemes, where participation is mandatory and the rules are tighter.